Project Description

Project Name: Stratford Suites

(No affiliation with Stratford Building Corp.)

Project Location: Airway Heights, WA

Building Type: Extended Stay Lodging and Support Building

Number of Modules and Square Footage: 64 Modules (16 buildings) comprising 40,000 sf

Factory Fabrication Time: (26) Twenty-six weeks over a staggered delivery schedule

Site Completion Time to Occupancy: Each building approximately 17 days after module placement

Details: Project consisted of 15 buildings each containing (4) four 600 sf (plus) two bedroom suites. Each suite equipped with “upscale” galley kitchen and designer bath.

Stratford undertook factory fabrication, transport to project, site placement of modules on prepared foundation, connect in ground utilities including fire sprinkler system. Further scope of work undertaken was to finish interior and exterior of each building and bring to occupancy.